
About SMDC
Our site “SMDC Logistique” was founded in 2004 in Saint Martin de Crau, in the South of France, and has direct access to the main roads to supply the South of France and Southern European countries. The site is also located 40 km away from the port of Fos-sur-Mer.
We currently offer a storage capacity of 300 000 m² with the possibility to build an additional 100 000 m² in the future. On this multi-customer site, Katoen Natie optimizes the use of its storage capacity and offers a great deal of flexibility to its customers.
SMDC Logistics offers its services in various business units: Consumer & Industrial Goods and raw materials management, particularly with a high level of expertise in retail flows.
-
16 years experience
Established in 2004
-
Company
Privately owned
-
Warehouse capacity
300.000 m² operated , expansion possibilities of 100.000 m²
-
Operations
Working with 700 employees
-
Types of warehouses
100% Sprinkler // From 9m to 12m height
-
Intermodality
Direct connections to main roads (A7, A9, A8, A51) 30 km from Fos Port
-
Quality certifications
AEO (Authorized Economic Operator)
-
Containers
18.000 per year
-
Prepared orders
15.000.000 boxes per year & 33.000.000 pieces per year

Value proposition of Katoen Natie SMDC
The size of the large multi-customer platforms allows Katoen Natie to create synergies between different operations on the same site. Not only synergies in the field of productive personnel, but also in the field of equipment, ICT, and management team. Due to the different types of operations on these multi-customer sites, Katoen Natie succeeds in optimizing the use of the surface and the warehouses. The use of our own WMS system for most operations on the same site (and also worldwide) enables a smooth and flexible start-up for new operations.
There is a solid base of skilled workforce available in the area. Katoen Natie employs almost 700 people on this site. Our operations are staffed with permanent and temporary employees, with the vast majority of temporary employees being well trained by Katoen Natie and switching from one operation to another to assist in the various peaks.
Staff is available 24/6 hours a day for the site because some work is carried out in day, night and weekend shifts.
Talk to an expertContact form
Please fill in all fields
Z.I Ecopole Avenue Lavoisier
13310 Saint-Martin-de-Crau, France